El Dorado Project
Location: British Columbia, Canada
Rated Output: 1,100 kW
Head: 610 feet (186 meters)
Turbine Design: Twin-Nozzle Pelton
El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
Click any photo to enlarge
El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
El Dorado powerhouse exterior (structure on left).
El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
© Copyright 2011 Canyon Industries, Inc.
All rights reserved.